Client: Federación de maestros y estudiantes (FEDE)
Project Descriptionx
This project consisted of the construction of an industrial shed that required 70,400 MH for its construction taking into consideration basic measures such as the temperature and ventilation of the shed, floor leveling, walls and windows, roof.