The dredging and construction of the Beach Club pier was a large project associated with the construction of the residential Beach Club complex, which required the participation of a team of professionals who determined the characteristics of the natural conditions of the place, optimum depth and permissible area The stability of the pier, slope and dredging volume, type of seabed, among other aspects relevant to the project, were also estimated.