Puerto Mares Pier

CONROY > Puerto Mares Pier

Specificsx

Location: Lechería, Anzoátegui
Area: 800 m2
Horas Hombre: 22.000
Year 2012
Client: Private

Project Descriptionx

The dredging and construction of the Puerto Mares pier was a large project associated with the construction of the Puerto Mares residential complex, which required the participation of a team of professionals who determined the characteristics of the natural conditions of the place, optimum depth and permissible area, The stability of the dock, slope and dredging volume, type of seabed, among other aspects relevant to the project were also estimated.